2016 BMW M3 — VIN WBS8M9C58G5D31792

История аукциона VIN WBS8M9C58G5D31792

Пример отчета

Характеристики

VIN WBS8M9C58G5D31792
Технические характеристики
Двигатель 3.0L Turbocharged
Тип топлива
Цилиндры 6
Коробка передач A/T
Привод Rear Wheel Drive
Цвет кузова ALPINE WHITE
Кузов
Комплектация 4dr Sdn
Condition Notes
Announcements
EXEC PK,LIGHT PK,DCT,19"WHLS WARRANTY BKS/K1
High Value Options
Back-Up Camera Blind Spot Monitor Bluetooth Connection Climate Control Hard Disk Drive Media Storage Heads-Up Display Heated Front Seat(s) Heated Rear Seat(s) Heated Steering Wheel HID headlights Integrated Turn Signal Mirrors Keyless Start Multi-Zone A/C Navigation System Power Driver Seat Power Passenger Seat Premium Sound System Rain Sensing Wipers Rear Parking Aid Satellite Radio Seat Memory Tire Pressure Monitor
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Brake Assist Bucket Seats Carbon Fiber Interior Trim CD Player Child Safety Locks Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Engine Immobilizer Floor Mats Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Intermittent Wipers Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Folding Mirrors Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Floor Mats Rear Head Air Bag Rear Spoiler Security System Stability Control Steering Wheel Audio Controls Telematics Tire Inflator Traction Control Transmission w/Dual Shift Mode Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Manual Tilt/Telescoping Steering Column Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Heated Front Sport Seats -inc: Lumbar Support Power Rear Windows Bmw Online Full Service Internet Access Sport Leather Steering Wheel Proximity Key For Doors And Push Button Start Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button Dual Zone Front Automatic Air Conditioning Rear HVAC w/Separate Controls Perimeter Alarm Engine Immobilizer Trip Computer Includes Power Side Bolster Support And Manual Thigh Support Memory Settings -inc: Driver Seat And Door Mirrors Integrated Navigation System w/Voice Activation Power 1st Row Windows w/Front And Rear 1-Touch Up/Down Power Door Locks w/Autolock Feature Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru Day-Night Auto-Dimming Rearview Mirror Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Garage Door Transmitter Cruise Control w/Steering Wheel Controls
Mechanical
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Electro-Mechanical Limited Slip Differential Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo Transmission: 6-Speed Manual Rear-Wheel Drive Electric Power-Assist Speed-Sensing Steering
Keys
Master - 2
Lighting Package - ZLP
Automatic High Beams Adaptive Full Led Lights
Executive Package - ZEC
Rear View Camera Retractable Headlight Washers Head-UP Display Heated Steering Wheel Park Distance Control
Exterior
Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Fixed Rear Window w/Defroster Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Lip Spoiler Tailgate/Rear Door Lock Included w/Power Door Locks Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
Entertainment
Bluetooth Wireless Phone Connectivity Radio: AM/FM Audio System Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory Satellite Radio w/1 Year Subscription 16 Harman/Kardon Speakers
Safety/Security
Dual Stage Driver And Passenger Seat-Mounted Side Airbags Bmw Assist eCall Emergency S.O.S Dual Stage Driver And Passenger Front Airbags Curtain 1st And 2nd Row Airbags Airbag Occupancy Sensor Tire Specific Low Tire Pressure Warning Driver And Passenger Knee Airbag Electronic Stability Control (Esc) ABS And Driveline Traction Control Rear Child Safety Locks
Other
Tier 2 CO2 Relevant Vehicles C02 Content Heated Steering Wheel M Double-Clutch Transmission Tire Pressure Monitor 19" Black Wheel 437 M Mix Tire Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Rear View Camera Power Rear Sunshade Rear Manual Side Window Shades Floor Mats Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Lumbar Support Adjustable Seat Width/Lumbar Storage Package Heated Front Seats Heated Rear Seats Adjustable Front Armrest Carbon Fiber Trim With Blk CHR Retractable Headlight Washers Park Distance Control Rain Sensor And Auto Headlight Automatic Climate Control Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Decoding For NO-Dazzle HGH BM Emergency Trunk Release Navigation System Head-UP Display Radio Control US Satellite Radio w/1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Hands-Free BLUETOOTH And USB SHADOWLINE Exterior Trim Anthracite HEADLINER Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Variable Light Decoding Daytime Driving Lights Shipping Package Characteristic Control Model Year Code Transport Protection Led Door Projector