2016 BMW M3 — VIN WBS8M9C50G5E68953

История аукциона VIN WBS8M9C50G5E68953

Пример отчета

Характеристики

VIN WBS8M9C50G5E68953
Технические характеристики
Двигатель 3.0L Turbocharged
Тип топлива
Цилиндры 6
Коробка передач 6-Speed M/T
Привод Rear Wheel Drive
Цвет кузова ALPINE WHITE
Кузов
Комплектация 4dr Sdn
Condition Notes
Announcements
DO NOT SELL - UPSTREAM SOLD LIA HONDA 8.15.19
High Value Options
Back-Up Camera Bluetooth Connection Climate Control Hard Disk Drive Media Storage Heads-Up Display Heated Front Seat(s) Heated Rear Seat(s) Heated Steering Wheel HID headlights Integrated Turn Signal Mirrors Multi-Zone A/C Navigation System Power Driver Seat Power Passenger Seat Premium Sound System Rain Sensing Wipers Rear A/C Rear Parking Aid Satellite Radio Seat Memory Tire Pressure Monitor
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Brake Assist Bucket Seats Carbon Fiber Interior Trim CD Player Child Safety Locks Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Engine Immobilizer Floor Mats Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Intermittent Wipers Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Head Air Bag Rear Spoiler Run Flat Tires Security System Stability Control Steering Wheel Audio Controls Telematics Tire Inflator Traction Control Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button Power 1st Row Windows w/Front And Rear 1-Touch Up/Down Garage Door Transmitter Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Memory Settings -inc: Driver Seat And Door Mirrors Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Cruise Control w/Steering Wheel Controls Dual Zone Front Automatic Air Conditioning Integrated Navigation System w/Voice Activation Perimeter Alarm Engine Immobilizer Manual Tilt/Telescoping Steering Column Includes Power Side Bolster Support And Manual Thigh Support Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru Sport Leather Steering Wheel Proximity Key For Doors And Push Button Start Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Heated Front Sport Seats -inc: Lumbar Support 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Power Rear Windows Trip Computer Bmw Online Full Service Internet Access Rear HVAC w/Separate Controls Day-Night Auto-Dimming Rearview Mirror Power Door Locks w/Autolock Feature
Mechanical
Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Electro-Mechanical Limited Slip Differential Electric Power-Assist Speed-Sensing Steering Transmission: 6-Speed Manual Rear-Wheel Drive
Keys
Smart - 2
M Competition Package - 7MN
Adaptive M Suspension SHADOWLINE Exterior Trim 20" M LT/ALU Wheel Star-SPK666 Competition Package Bmw IND Shadow Line Ext Cont
Executive Package - ZEC
Retractable Headlight Washers Heated Steering Wheel Park Distance Control Head-UP Display Rear View Camera
Lighting Package - ZLP
Adaptive Full Led Lights Automatic High Beams
Exterior
Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance Tailgate/Rear Door Lock Included w/Power Door Locks Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Lip Spoiler Fixed Rear Window w/Defroster
Entertainment
Radio: AM/FM Audio System Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory Bluetooth Wireless Phone Connectivity Satellite Radio w/1 Year Subscription 16 Harman/Kardon Speakers
Safety/Security
Electronic Stability Control (Esc) ABS And Driveline Traction Control Airbag Occupancy Sensor Driver And Passenger Knee Airbag Dual Stage Driver And Passenger Front Airbags Curtain 1st And 2nd Row Airbags Tire Specific Low Tire Pressure Warning Bmw Assist eCall Emergency S.O.S Rear Child Safety Locks Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Other
CO2 Relevant Vehicles C02 Content 20" M LT/ALU Wheel Star-SPK666 Heated Steering Wheel Tire Pressure Monitor Adaptive M Suspension Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Rear View Camera Power Rear Sunshade Rear Manual Side Window Shades Floor Mats Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Adjustable Seat Width/Lumbar Storage Package Heated Front Seats Heated Rear Seats Adjustable Front Armrest Carbon Fiber Trim With Blk CHR Retractable Headlight Washers Park Distance Control Rain Sensor And Auto Headlight Automatic Climate Control Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Decoding For NO-Dazzle HGH BM Emergency Trunk Release Navigation System Head-UP Display Radio Control US Satellite Radio w/1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Hands-Free BLUETOOTH And USB SHADOWLINE Exterior Trim Anthracite HEADLINER Bmw IND Shadow Line Ext Cont Competition Package Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Variable Light Decoding Daytime Driving Lights Shipping Package Characteristic Control Model Year Code Transport Protection CF FRNT Attachment w/Aero Kit Rear Diffuser Active Comfort Seats Competition Package Manual Transmission Tier 2