VIN
WBS8M9C52G5E68551
Технические характеристики
Двигатель
3.0L Turbocharged
Тип топлива
Цилиндры
6
Коробка передач
A/T
Привод
Rear Wheel Drive
Цвет кузова
Black
Кузов
Комплектация
4dr Sdn
Condition Notes
Announcements
ADAPTIVE M SUSPENSION,COMPETITION PACKAGE,HS,LIGHTING
COMFORT ACCESS
U34 BOOKS/1KEY
DO NOT SELL - UPSTREAM SOLD
EXECUTIVE,HEADS UP,NAV,PDC
High Value Options
Automatic Parking
Back-Up Camera
Blind Spot Monitor
Bluetooth Connection
Climate Control
Heads-Up Display
Heated Front Seat(s)
Heated Rear Seat(s)
Heated Steering Wheel
Integrated Turn Signal Mirrors
Keyless Start
Multi-Zone A/C
Navigation System
Power Driver Seat
Power Passenger Seat
Premium Sound System
Rain Sensing Wipers
Rear A/C
Rear Parking Aid
Satellite Radio
Seat Memory
Tire Pressure Monitor
Options
A/C
Adjustable Steering Wheel
AM/FM Stereo
Auto-Dimming Rearview Mirror
Automatic Headlights
Auxiliary Audio Input
Brake Assist
Bucket Seats
CD Player
Child Safety Locks
Cruise Control
Driver Air Bag
Driver Illuminated Vanity Mirror
Driver Vanity Mirror
Engine Immobilizer
Floor Mats
Front Head Air Bag
Front Side Air Bag
HD Radio
Heated Mirrors
Intermittent Wipers
Keyless Entry
Knee Air Bag
Leather Steering Wheel
Mirror Memory
Pass-Through Rear Seat
Passenger Adjustable Lumbar
Passenger Air Bag
Passenger Air Bag Sensor
Passenger Illuminated Visor Mirror
Passenger Vanity Mirror
Power Door Locks
Power Folding Mirrors
Power Mirror(s)
Power Steering
Power Windows
Privacy Glass
Rear Bench Seat
Rear Defrost
Rear Floor Mats
Rear Head Air Bag
Rear Spoiler
Security System
Stability Control
Steering Wheel Audio Controls
Telematics
Tire Inflator
Traction Control
Transmission w/Dual Shift Mode
Trip Computer
Universal Garage Door Opener
Variable Speed Intermittent Wipers
Interior
Heated Front Sport Seats -inc: Lumbar Support
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Manual Tilt/Telescoping Steering Column
Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer
Power Rear Windows
Bmw Online Full Service Internet Access
Power Door Locks w/Autolock Feature
Trip Computer
Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button
Garage Door Transmitter
Engine Immobilizer
Cruise Control w/Steering Wheel Controls
Dual Zone Front Automatic Air Conditioning
Rear HVAC w/Separate Controls
Day-Night Auto-Dimming Rearview Mirror
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Integrated Navigation System w/Voice Activation
Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
Sport Leather Steering Wheel
Proximity Key For Doors And Push Button Start
Includes Power Side Bolster Support And Manual Thigh Support
Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru
Perimeter Alarm
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Memory Settings -inc: Driver Seat And Door Mirrors
Mechanical
Transmission: 6-Speed Manual
Rear-Wheel Drive
Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo
Electric Power-Assist Speed-Sensing Steering
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control
Electro-Mechanical Limited Slip Differential
Keys
Smart - 2
Executive Package - ZEC
Heated Steering Wheel
Head-UP Display
Rear View Camera
Retractable Headlight Washers
Park Distance Control
Lighting Package - ZLP
Adaptive Full Led Lights
Automatic High Beams
M Competition Package - 7MN
SHADOWLINE Exterior Trim
Adaptive M Suspension
Competition Package
Bmw IND Shadow Line Ext Cont
20" M LT/ALU Wheel Star-SPK666
Exterior
Tailgate/Rear Door Lock Included w/Power Door Locks
Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Lip Spoiler
Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance
Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M
Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator
Fixed Rear Window w/Defroster
Entertainment
Radio: AM/FM Audio System
Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory
Satellite Radio w/1 Year Subscription
16 Harman/Kardon Speakers
Bluetooth Wireless Phone Connectivity
Safety/Security
Bmw Assist eCall Emergency S.O.S
Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags
Curtain 1st And 2nd Row Airbags
Airbag Occupancy Sensor
Driver And Passenger Knee Airbag
Rear Child Safety Locks
ABS And Driveline Traction Control
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Electronic Stability Control (Esc)
Other
Competition Package
NO Sunshades
Tier 2
CO2 Relevant Vehicles
C02 Content
20" M LT/ALU Wheel Star-SPK666
Heated Steering Wheel
M Double-Clutch Transmission
Tire Pressure Monitor
Adaptive M Suspension
Alarm System
Universal Garage-Door Opener
Comfort Access Keyless Entry
Rear View Camera
Floor Mats
Auto-Dimming Mirrors
Auto-Dimming REARVIEW Mirror
Power Front Seats
Adjustable Seat Width/Lumbar
Storage Package
Heated Front Seats
Heated Rear Seats
Adjustable Front Armrest
Carbon Fiber Trim With Blk CHR
Retractable Headlight Washers
Park Distance Control
Rain Sensor And Auto Headlight
Automatic Climate Control
Dynamic Cruise Control
Adaptive Full Led Lights
Ambient Lighting
Additional 12-V Power Sockets
Automatic High Beams
Decoding For NO-Dazzle HGH BM
Emergency Trunk Release
Navigation System
Head-UP Display
Radio Control US
Satellite Radio w/1 Year SUB.
HARMAN KARDON Surround Sound
DVD Area Coding, North America
Bmw Assist ECALL
Bmw TELESERVICES
Bmw Online And Bmw APPS
Advanced RTTI
Remote Services
Enhanced B/T And SMARTPHONE IN
SHADOWLINE Exterior Trim
Anthracite HEADLINER
Bmw IND Shadow Line Ext Cont
Competition Package
Hot Climate Version
Acoustic Belt Warning
Language Version English
Oil CHG 10,000 MLS/12 Months
Variable Light Decoding
Daytime Driving Lights
Shipping Package
Characteristic Control
Model Year Code
Transport Protection
Active Comfort Seats