2017 BMW M4 — VIN WBS3R9C50HK709342

История аукциона VIN WBS3R9C50HK709342

Пример отчета

Характеристики

VIN WBS3R9C50HK709342
Технические характеристики
Двигатель
Тип топлива
Цилиндры 6
Коробка передач A/T
Привод Rear Wheel Drive
Цвет кузова ALPINE WHITE
Кузов
Комплектация Coupe
Condition Notes
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Bucket Seats CD Player Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Head Air Bag Security System Stability Control Steering Wheel Audio Controls Telematics Traction Control Transmission w/Dual Shift Mode Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Day-Night Auto-Dimming Rearview Mirror Memory Settings -inc: Driver Seat And Door Mirrors Perimeter Alarm 10-Way Power Driver Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt, Manual Cushion Extension And Power Rear Seat Easy Entry Fob Controls -inc: Trunk/Hatch/Tailgate And Windows Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry And Panic Button Sport Leather Steering Wheel Garage Door Transmitter Trip Computer Bmw Online Full Service Internet Access 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Integrated Navigation System w/Voice Activation Proximity Key For Doors And Push Button Start Cruise Control w/Steering Wheel Controls Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Engine Immobilizer Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down Manual Tilt/Telescoping Steering Column Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Heated Front Sport Seats -inc: Lumbar Support Rear HVAC w/Separate Controls Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Cloth/Leather Upholstery Power Door Locks w/Autolock Feature Dual Zone Front Automatic Air Conditioning 10-Way Power Passenger Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt, Manual Cushion Extension And Power Rear Seat Easy Entry
Mechanical
Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo w/o ZCP-inc: Automatic Start/Stop Function w/ZCP-inc: Automatic Start/Stop Function With 444 HP 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Transmission: 6-Speed Manual Electric Power-Assist Speed-Sensing Steering Electro-Mechanical Limited Slip Differential Rear-Wheel Drive Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Keys
Master - 1
M Competition Package - 7MN
SHADOWLINE Exterior Trim Adaptive M Suspension Bmw IND Shadow Line Ext Cont Competition Package 20" M LT/ALU Wheel Star-SPK666
Executive Package - ZEC
Heated Steering Wheel Wireless Charging Head-UP Display Park Distance Control Retractable Headlight Washers Rear View Camera
Lighting Package - ZLP
Automatic High Beams Adaptive Full Led Lights
Exterior
Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off Tailgate/Rear Door Lock Included w/Power Door Locks Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Fixed Rear Window w/Defroster
Entertainment
harman/kardon Surround Sound System Satellite Radio w/1 Year Subscription Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio And 20 Gb Internal Memory Radio: AM/FM Audio System -inc: Advanced Real-Time Traffic Information And Hands-Free Bluetooth And USB Audio Connection
Safety/Security
Driver And Passenger Knee Airbag Bmw Assist eCall Emergency S.O.S Electronic Stability Control (Esc) Airbag Occupancy Sensor ABS And Driveline Traction Control Tire Specific Low Tire Pressure Warning Dual Stage Driver And Passenger Seat-Mounted Side Airbags Dual Stage Driver And Passenger Front Airbags Curtain 1st And 2nd Row Airbags
Other
CO2 Relevant Vehicles C02 Content 20" M LT/ALU Wheel Star-SPK666 Heated Steering Wheel M Double-Clutch Transmission Tire Pressure Monitor Adaptive M Suspension Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Rear View Camera Floor Mats Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Adjustable Seat Width Storage Package Heated Front Seats Adjustable Front Armrest Carbon Fiber Trim With Blk CHR Retractable Headlight Washers Park Distance Control Rain Sensor And Auto Headlight Automatic Climate Control Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Decoding For NO-Dazzle HGH BM Emergency Trunk Release Navigation System Head-UP Display Radio Control US SIRIUSXM Radio w/ 1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Apple CARPLAY Compatibility Wireless Charging WIFI HOTSPOT SHADOWLINE Exterior Trim Anthracite HEADLINER Bmw IND Shadow Line Ext Cont Competition Package Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Refrigerant Variable Light Decoding Daytime Driving Lights Shipping Package Characteristic Control Model Year Code Transport Protection Wheel Locks Connected App Compatibility Competition Package Enhanced USB & BLUETOOTH Tier 2