2017 BMW M4 — VIN WBS3R9C3XHA014094

История аукциона VIN WBS3R9C3XHA014094

Пример отчета

Характеристики

VIN WBS3R9C3XHA014094
Технические характеристики
Двигатель 3.0L Turbocharged
Тип топлива
Цилиндры 6
Коробка передач A/T
Привод Rear Wheel Drive
Цвет кузова Blue
Кузов
Комплектация Coupe
Condition Notes
Announcements
EXECUTIVE, LIGHTING,ADAPTIVE M SUSPENSION PDC,COMFORT ACCESSS KEYLESS ENTRY,HS PARKING ASSISTAMT,HEADS UP,COMPETITION PACKAGE L37 1KEY DRIVING ASSISTANCE PLUS
High Value Options
Automatic Parking Back-Up Camera Blind Spot Monitor Bluetooth Connection Climate Control Hard Disk Drive Media Storage Heads-Up Display Heated Front Seat(s) Heated Steering Wheel HID headlights Integrated Turn Signal Mirrors Keyless Start Lane Departure Warning Multi-Zone A/C Navigation System Power Driver Seat Power Passenger Seat Premium Sound System Rain Sensing Wipers Rear A/C Rear Parking Aid Satellite Radio Seat Memory Smart Device Integration Tire Pressure Monitor Woodgrain Interior Trim
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Brake Assist Bucket Seats CD Player Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Engine Immobilizer Floor Mats Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Head Air Bag Security System Stability Control Steering Wheel Audio Controls Telematics Traction Control Transmission w/Dual Shift Mode Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Sport Leather Steering Wheel Cruise Control w/Steering Wheel Controls Heated Front Sport Seats -inc: Lumbar Support Integrated Navigation System w/Voice Activation Trip Computer Rear HVAC w/Separate Controls 10-Way Power Driver Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt, Manual Cushion Extension And Power Rear Seat Easy Entry Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down Bmw Online Full Service Internet Access Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Proximity Key For Doors And Push Button Start Memory Settings -inc: Driver Seat And Door Mirrors Engine Immobilizer Dual Zone Front Automatic Air Conditioning Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Fob Controls -inc: Trunk/Hatch/Tailgate And Windows Power Door Locks w/Autolock Feature 10-Way Power Passenger Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt, Manual Cushion Extension And Power Rear Seat Easy Entry Garage Door Transmitter Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Manual Tilt/Telescoping Steering Column Cloth/Leather Upholstery Perimeter Alarm 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Day-Night Auto-Dimming Rearview Mirror Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry And Panic Button
Mechanical
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Transmission: 6-Speed Manual Electric Power-Assist Speed-Sensing Steering Electro-Mechanical Limited Slip Differential Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo w/o ZCP-inc: Automatic Start/Stop Function w/ZCP-inc: Automatic Start/Stop Function With 444 HP Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension Rear-Wheel Drive
Keys
Smart - 2
M Competition Package - 7MN
Bmw IND Shadow Line Ext Cont SHADOWLINE Exterior Trim Adaptive M Suspension 20" M LT/ALU Wheel Star-SPK666 Competition Package
Driving Assistance Plus - ZDB
Active Driving Assistant Side And Top View Cameras Speed Limit Info Active Blind Spot Detection
Executive Package - ZEC
Wireless Charging Heated Steering Wheel Park Distance Control Rear View Camera Head-UP Display Retractable Headlight Washers
Lighting Package - ZLP
Automatic High Beams Adaptive Full Led Lights
Exterior
Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator Tailgate/Rear Door Lock Included w/Power Door Locks Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Fixed Rear Window w/Defroster Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
Entertainment
Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio And 20 Gb Internal Memory Radio: AM/FM Audio System -inc: Advanced Real-Time Traffic Information And Hands-Free Bluetooth And USB Audio Connection harman/kardon Surround Sound System Satellite Radio w/1 Year Subscription
Safety/Security
ABS And Driveline Traction Control Electronic Stability Control (Esc) Dual Stage Driver And Passenger Seat-Mounted Side Airbags Curtain 1st And 2nd Row Airbags Tire Specific Low Tire Pressure Warning Driver And Passenger Knee Airbag Airbag Occupancy Sensor Bmw Assist eCall Emergency S.O.S Dual Stage Driver And Passenger Front Airbags
Other
CO2 Relevant Vehicles C02 Content 20" M LT/ALU Wheel Star-SPK666 Heated Steering Wheel M Double-Clutch Transmission Tire Pressure Monitor Adaptive M Suspension Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Rear View Camera Moonroof Floor Mats Warning Triangle Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Adjustable Seat Width Storage Package Heated Front Seats Adjustable Front Armrest Retractable Headlight Washers Park Distance Control Rain Sensor And Auto Headlight Automatic Climate Control Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Active Blind Spot Detection Decoding For NO-Dazzle HGH BM Active Driving Assistant Side And Top View Cameras Parking Assistant Emergency Trunk Release Navigation System Head-UP Display Radio Control US SIRIUSXM Radio w/ 1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Apple CARPLAY Compatibility Wireless Charging WIFI HOTSPOT SHADOWLINE Exterior Trim Anthracite HEADLINER Bmw IND Shadow Line Ext Cont Competition Package Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Refrigerant Variable Light Decoding Speed Limit Info Daytime Driving Lights Shipping Package Characteristic Control Transport Protection Dark Red Sycamore Wood Trim Merino Leather Dashboard Connected App Compatibility Competition Package Enhanced USB & BLUETOOTH Tier 2