2017 BMW M3 — VIN WBS8M9C34H5G84952

История аукциона VIN WBS8M9C34H5G84952

Пример отчета

Характеристики

VIN WBS8M9C34H5G84952
Технические характеристики
Двигатель 3.0L Turbocharged
Тип топлива
Цилиндры 6
Коробка передач A/T
Привод Rear Wheel Drive
Цвет кузова MINERAL WHITE METALLIC
Кузов
Комплектация Sedan
Condition Notes
Announcements
DAP+;EXEC;LIGHT;NAV;HK;BT
High Value Options
Back-Up Camera Blind Spot Monitor Bluetooth Connection Climate Control Hard Disk Drive Media Storage Heads-Up Display Heated Front Seat(s) Heated Rear Seat(s) Heated Steering Wheel HID headlights Integrated Turn Signal Mirrors Keyless Start Lane Departure Warning Multi-Zone A/C Navigation System Power Driver Seat Power Passenger Seat Premium Sound System Rain Sensing Wipers Rear A/C Rear Parking Aid Satellite Radio Seat Memory Smart Device Integration Tire Pressure Monitor
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Brake Assist Bucket Seats CD Player Child Safety Locks Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Engine Immobilizer Floor Mats Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Folding Mirrors Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Head Air Bag Rear Spoiler Security System Stability Control Steering Wheel Audio Controls Telematics Tire Inflator Traction Control Transmission w/Dual Shift Mode Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Rear HVAC w/Separate Controls 10-Way Power Passenger Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension Engine Immobilizer Fob Controls -inc: Trunk/Hatch/Tailgate, Windows And Sunroof/Convertible Roof Cruise Control w/Steering Wheel Controls Bmw Online Full Service Internet Access Trip Computer Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button Heated Front Sport Seats -inc: Lumbar Support Power Door Locks w/Autolock Feature Day-Night Auto-Dimming Rearview Mirror Dual Zone Front Automatic Air Conditioning Integrated Navigation System w/Voice Activation Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Power 1st Row Windows w/Front And Rear 1-Touch Up/Down Cloth/Leather Upholstery Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Power Rear Windows Manual Tilt/Telescoping Steering Column Proximity Key For Doors And Push Button Start Memory Settings -inc: Driver Seat And Door Mirrors Sport Leather Steering Wheel Smart Device Integration 10-Way Power Driver Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension Perimeter Alarm Garage Door Transmitter Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Mechanical
Transmission: 6-Speed Manual Electro-Mechanical Limited Slip Differential Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension Rear-Wheel Drive 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Electric Power-Assist Speed-Sensing Steering Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo w/ZCP-inc: 444 HP With High Precision Direct Injection
Keys
Master - 2
Driving Assistance Plus - ZDB
Active Driving Assistant Active Blind Spot Detection Speed Limit Info Side And Top View Cameras
Executive Package - ZEC
Park Distance Control Retractable Headlight Washers Wireless Charging Heated Steering Wheel Head-UP Display Rear View Camera
Lighting Package - ZLP
Automatic High Beams Adaptive Full Led Lights
Exterior
Fixed Rear Window w/Defroster Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding And Turn Signal Indicator Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Tailgate/Rear Door Lock Included w/Power Door Locks Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Lip Spoiler Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
Entertainment
Satellite Radio w/1 Year Subscription harman/kardon Surround Sound System Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory Radio: AM/FM Audio System Bluetooth Wireless Phone Connectivity
Safety/Security
Rear Child Safety Locks Bmw Assist eCall Emergency S.O.S Driver And Passenger Knee Airbag Electronic Stability Control (Esc) Dual Stage Driver And Passenger Front Airbags Tire Specific Low Tire Pressure Warning Airbag Occupancy Sensor ABS And Driveline Traction Control Dual Stage Driver And Passenger Seat-Mounted Side Airbags Curtain 1st And 2nd Row Airbags
Other
CO2 Relevant Vehicles C02 Content Heated Steering Wheel M Double-Clutch Transmission Tire Pressure Monitor Adaptive M Suspension 19" Black Wheel 437 M Mix Tire Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Rear View Camera Floor Mats Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Lumbar Support Adjustable Seat Width Storage Package Heated Front Seats Heated Rear Seats Adjustable Front Armrest Carbon Fiber Trim With Blk CHR Retractable Headlight Washers Park Distance Control Rain Sensor And Auto Headlight Automatic Climate Control Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Active Blind Spot Detection Decoding For NO-Dazzle HGH BM Active Driving Assistant Side And Top View Cameras Emergency Trunk Release Navigation System Head-UP Display Radio Control US SIRIUSXM Radio w/ 1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Apple CARPLAY Compatibility Wireless Charging WIFI HOTSPOT SHADOWLINE Exterior Trim Anthracite HEADLINER Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Refrigerant Variable Light Decoding Speed Limit Info Daytime Driving Lights Shipping Package Characteristic Control Model Year Code Transport Protection Connected App Compatibility Enhanced USB & BLUETOOTH NO Sunshades Tier 2