2017 BMW M3 — VIN WBS8M9C38H5G85621

История аукциона VIN WBS8M9C38H5G85621

Пример отчета

Характеристики

VIN WBS8M9C38H5G85621
Технические характеристики
Двигатель
Тип топлива
Цилиндры 6
Коробка передач A/T
Привод Rear Wheel Drive
Цвет кузова Mineral Gray Metallic
Кузов
Комплектация Sedan
Condition Notes
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Brake Assist Bucket Seats CD Player Child Safety Locks Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Engine Immobilizer Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Folding Mirrors Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Head Air Bag Rear Spoiler Run Flat Tires Security System Stability Control Steering Wheel Audio Controls Telematics Traction Control Transmission w/Dual Shift Mode Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Cloth/Leather Upholstery 10-Way Power Driver Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension Power Door Locks w/Autolock Feature Day-Night Auto-Dimming Rearview Mirror Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Garage Door Transmitter Rear HVAC w/Separate Controls 10-Way Power Passenger Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension Memory Settings -inc: Driver Seat And Door Mirrors Perimeter Alarm Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru Trip Computer Smart Device Integration Cruise Control w/Steering Wheel Controls Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button Proximity Key For Doors And Push Button Start Manual Tilt/Telescoping Steering Column Integrated Navigation System w/Voice Activation Bmw Online Full Service Internet Access Fob Controls -inc: Trunk/Hatch/Tailgate, Windows And Sunroof/Convertible Roof Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Sport Leather Steering Wheel Power Rear Windows Heated Front Sport Seats -inc: Lumbar Support Power 1st Row Windows w/Front And Rear 1-Touch Up/Down Dual Zone Front Automatic Air Conditioning Engine Immobilizer
Mechanical
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension Rear-Wheel Drive 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Electric Power-Assist Speed-Sensing Steering Transmission: 6-Speed Manual Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo w/ZCP-inc: 444 HP With High Precision Direct Injection Electro-Mechanical Limited Slip Differential
Keys
Master - 2
M Competition Package - 7MN
SHADOWLINE Exterior Trim 20" M LT/ALU Wheel Star-SPK666 Adaptive M Suspension Bmw IND Shadow Line Ext Cont Competition Package
Driving Assistance Plus - ZDB
Active Driving Assistant Speed Limit Info Active Blind Spot Detection Side And Top View Cameras
Executive Package - ZEC
Wireless Charging Head-UP Display Retractable Headlight Washers Heated Steering Wheel Park Distance Control Rear View Camera
Lighting Package - ZLP
Adaptive Full Led Lights Automatic High Beams
Exterior
Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding And Turn Signal Indicator Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance Lip Spoiler Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Fixed Rear Window w/Defroster Tailgate/Rear Door Lock Included w/Power Door Locks Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
Entertainment
Bluetooth Wireless Phone Connectivity harman/kardon Surround Sound System Satellite Radio w/1 Year Subscription Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory Radio: AM/FM Audio System
Safety/Security
Dual Stage Driver And Passenger Front Airbags Rear Child Safety Locks Curtain 1st And 2nd Row Airbags Tire Specific Low Tire Pressure Warning ABS And Driveline Traction Control Electronic Stability Control (Esc) Driver And Passenger Knee Airbag Bmw Assist eCall Emergency S.O.S Airbag Occupancy Sensor Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Other
CO2 Relevant Vehicles C02 Content 20" M LT/ALU Wheel Star-SPK666 Heated Steering Wheel M Double-Clutch Transmission Tire Pressure Monitor Adaptive M Suspension Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Rear View Camera Moonroof Power Rear Sunshade Rear Manual Side Window Shades Floor Mats Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Adjustable Seat Width Storage Package Heated Front Seats Heated Rear Seats Adjustable Front Armrest Aluminum Blade Trim W Blk CHRM Retractable Headlight Washers Park Distance Control Rain Sensor And Auto Headlight Automatic Climate Control Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Active Blind Spot Detection Decoding For NO-Dazzle HGH BM Active Driving Assistant Side And Top View Cameras Emergency Trunk Release Navigation System Head-UP Display Radio Control US SIRIUSXM Radio w/ 1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Apple CARPLAY Compatibility Wireless Charging WIFI HOTSPOT SHADOWLINE Exterior Trim Anthracite HEADLINER Bmw IND Shadow Line Ext Cont Competition Package Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Refrigerant Variable Light Decoding Speed Limit Info Daytime Driving Lights Shipping Package Characteristic Control Transport Protection Connected App Compatibility Competition Package Enhanced USB & BLUETOOTH Tier 2