2018 BMW M4 — VIN WBS4Y9C51JAA85914

История аукциона VIN WBS4Y9C51JAA85914

Пример отчета

Характеристики

VIN WBS4Y9C51JAA85914
Технические характеристики
Двигатель
Тип топлива
Цилиндры 6
Коробка передач A/T
Привод Rear Wheel Drive
Цвет кузова Yas Marina Blue Metallic
Кузов
Комплектация Coupe
Condition Notes
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Bucket Seats Carbon Fiber Interior Trim CD Player Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Floor Mats Front Head Air Bag Front Side Air Bag HD Radio Heated Mirrors Intermittent Wipers Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Floor Mats Rear Head Air Bag Security System Steering Wheel Audio Controls Telematics Tire Inflator Traction Control Transmission w/Dual Shift Mode Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Rear HVAC w/Separate Controls Cruise Control w/Steering Wheel Controls Dual Zone Front Automatic Air Conditioning Power Door Locks w/Autolock Feature Trip Computer Lumbar Support Perimeter Alarm Manual Tilt/Telescoping Steering Column Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry And Panic Button Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats ConnectedDrive Services Full Service Internet Access Engine Immobilizer Cloth/Leather Upholstery Day-Night Auto-Dimming Rearview Mirror Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Sport Leather Steering Wheel Garage Door Transmitter Sport Front Seats Proximity Key For Doors And Push Button Start 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Heated Front Seats Power Front Seats Memory Settings -inc: Driver Seat And Door Mirrors Fob Controls -inc: Trunk/Hatch/Tailgate And Windows Smart Device Integration Navigation System Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
Mechanical
Engine: 3.0L 6-Cylinder TwinPower Turbo w/o ZCP-inc: Automatic Start/Stop Function w/ZCP-inc: Automatic Start/Stop Function With 444 HP Transmission: 6-Speed Manual Rear-Wheel Drive Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension Electric Power-Assist Speed-Sensing Steering 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Electro-Mechanical Limited Slip Differential
Keys
Smart - 1
M Competition Package - 7MN
SHADOWLINE Exterior Trim Bmw IND Shadow Line Ext Cont 19" Black Wheel 437 M Mix Tire Adaptive M Suspension Competition Package
Executive Package - ZPX
Speed Limit Info Head-UP Display Automatic High Beams Adaptive Full Led Lights Parking Assistant Side And Top View Cameras
Exterior
Fixed Rear Window w/Defroster Fully Automatic Aero-Composite Led Low/High Beam Daytime Running Auto-Leveling Headlamps w/Delay-Off Front Fog Lamps Tires: P255/40R18 Front & P275/40R18 Rear -inc: Mixed Performance Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator Wheels: 18" x 9" Front & 18" x 10" Rear -inc: M Ferric Gray, V-spoke, Style 513M Tailgate/Rear Door Lock Included w/Power Door Locks Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Entertainment
HD Radio SiriusXM Satellite Radio -inc: 1 Year All Access Subscription Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio And 20 Gb Internal Memory harman/kardon Surround Sound System Hands-Free Bluetooth & USB Audio Connection Radio: AM/FM Audio System
Safety/Security
Dual Stage Driver And Passenger Seat-Mounted Side Airbags Bmw Assist eCall Emergency S.O.S Tire Specific Low Tire Pressure Warning Electronic Stability Control (Esc) ABS And Driveline Traction Control Driver And Passenger Knee Airbag Back-Up Camera Dual Stage Driver And Passenger Front Airbags Curtain 1st And 2nd Row Airbags Airbag Occupancy Sensor
Other
CO2 Relevant Vehicles C02 Content Heated Steering Wheel M Double-Clutch Transmission M Carbon Ceramic Brakes Tire Pressure Monitor Adaptive M Suspension 19" Black Wheel 437 M Mix Tire Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Rear View Camera Floor Mats Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Adjustable Seat Width Storage Package Heated Front Seats Adjustable Front Armrest Carbon Fiber Trim With Blk CHR Park Distance Control Rain Sensor And Auto Headlight Automatic Climate Control Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Active Blind Spot Detection Decoding For NO-Dazzle HGH BM Active Driving Assistant Side And Top View Cameras Parking Assistant Emergency Trunk Release Navigation System Head-UP Display Radio Control US SIRIUSXM Radio w/ 1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Apple CARPLAY Compatibility Wireless Charging WIFI HOTSPOT SHADOWLINE Exterior Trim Anthracite HEADLINER Bmw IND Shadow Line Ext Cont Competition Package Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Refrigerant Variable Light Decoding Speed Limit Info Daytime Driving Lights Shipping Package Characteristic Control Model Year Code Transport Protection Competition Package Enhanced USB & BLUETOOTH Tier 2