2016 BMW M4 — VIN WBS3R9C51GK708232

История аукциона VIN WBS3R9C51GK708232

Пример отчета

Характеристики

VIN WBS3R9C51GK708232
Технические характеристики
Двигатель 3.0L Turbocharged
Тип топлива
Цилиндры 6
Коробка передач A/T
Привод Rear Wheel Drive
Цвет кузова ALPINE WHITE
Кузов
Комплектация 2dr Cpe
Condition Notes
Announcements
MULTI-POINT INSPECTION DO NOT SELL - UPSTREAM SOLD DMV$98
High Value Options
Bluetooth Connection Climate Control Hard Disk Drive Media Storage Heads-Up Display Heated Front Seat(s) Heated Steering Wheel HID headlights Integrated Turn Signal Mirrors Multi-Zone A/C Navigation System Power Driver Seat Power Passenger Seat Premium Sound System Rain Sensing Wipers Rear Parking Aid Satellite Radio Seat Memory Smart Device Integration Tire Pressure Monitor
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Bucket Seats Carbon Fiber Interior Trim CD Player Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Engine Immobilizer Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Intermittent Wipers Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Mirror(s) Power Steering Power Windows Rear Defrost Rear Head Air Bag Security System Stability Control Steering Wheel Audio Controls Telematics Traction Control Transmission w/Dual Shift Mode Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Includes Power Side Bolster Support, Manual Thigh Support And Power Rear Seat Easy Entry Manual Tilt/Telescoping Steering Column Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Bmw Online Full Service Internet Access Sport Leather Steering Wheel Proximity Key For Doors And Push Button Start Heated Front Sport Seats -inc: Lumbar Support 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Rear HVAC w/Separate Controls Day-Night Auto-Dimming Rearview Mirror Memory Settings -inc: Driver Seat And Door Mirrors Integrated Navigation System w/Voice Activation Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down Power Door Locks w/Autolock Feature Trip Computer Perimeter Alarm Engine Immobilizer Cruise Control w/Steering Wheel Controls Dual Zone Front Automatic Air Conditioning Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry And Panic Button Garage Door Transmitter
Mechanical
Transmission: 6-Speed Manual Rear-Wheel Drive Electric Power-Assist Speed-Sensing Steering 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Electro-Mechanical Limited Slip Differential Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo
Keys
Master - 2
Executive Package - ZEC
Rear View Camera Retractable Headlight Washers Park Distance Control Heated Steering Wheel Head-UP Display
Lighting Package - ZLP
Automatic High Beams Adaptive Full Led Lights
M Competition Package - 7MN
SHADOWLINE Exterior Trim Adaptive M Suspension Bmw IND Shadow Line Ext Cont Competition Package 20" M LT/ALU Wheel Star-SPK666
Exterior
Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator Fixed Rear Window w/Defroster Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Tailgate/Rear Door Lock Included w/Power Door Locks Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance
Entertainment
Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory Harman/Kardon Surround Sound System Satellite Radio w/1 Year Subscription Bluetooth Wireless Phone Connectivity Radio: AM/FM Audio System
Safety/Security
Curtain 1st And 2nd Row Airbags Airbag Occupancy Sensor Driver And Passenger Knee Airbag Electronic Stability Control (Esc) ABS And Driveline Traction Control Dual Stage Driver And Passenger Seat-Mounted Side Airbags Bmw Assist eCall Emergency S.O.S Tire Specific Low Tire Pressure Warning Dual Stage Driver And Passenger Front Airbags
Other
CO2 Relevant Vehicles C02 Content 20" M LT/ALU Wheel Star-SPK666 Heated Steering Wheel M Double-Clutch Transmission Tire Pressure Monitor Adaptive M Suspension Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Rear View Camera Power Rear Sunshade Floor Mats Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Adjustable Seat Width/Lumbar Storage Package Heated Front Seats Adjustable Front Armrest Carbon Fiber Trim With Blk CHR Retractable Headlight Washers Park Distance Control Rain Sensor And Auto Headlight Automatic Climate Control Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Decoding For NO-Dazzle HGH BM Emergency Trunk Release Navigation System Head-UP Display Radio Control US Satellite Radio w/1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Enhanced B/T And SMARTPHONE IN SHADOWLINE Exterior Trim Anthracite HEADLINER Bmw IND Shadow Line Ext Cont Competition Package Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Variable Light Decoding Daytime Driving Lights Shipping Package Characteristic Control Model Year Code Transport Protection Bmw License Plate Frame-BK Wheel Locks Active Comfort Seats Competition Package Bmw First Aid Kit Tier 2