VIN
WBS8M9C5XG5D30238
Технические характеристики
Двигатель
3.0L Turbocharged
Тип топлива
Цилиндры
6
Коробка передач
A/T
Привод
Rear Wheel Drive
Цвет кузова
Gray
Кузов
Комплектация
4dr Sdn
Condition Notes
Announcements
GREEN LIGHT PRE-INSPECTED
High Value Options
Back-Up Camera
Blind Spot Monitor
Bluetooth Connection
Climate Control
Hard Disk Drive Media Storage
Heads-Up Display
Heated Front Seat(s)
Heated Rear Seat(s)
Heated Steering Wheel
HID headlights
Integrated Turn Signal Mirrors
Keyless Start
Multi-Zone A/C
Navigation System
Power Driver Seat
Power Passenger Seat
Premium Sound System
Rain Sensing Wipers
Rear A/C
Rear Parking Aid
Satellite Radio
Seat Memory
Smart Device Integration
Tire Pressure Monitor
Options
A/C
Adjustable Steering Wheel
AM/FM Stereo
Auto-Dimming Rearview Mirror
Automatic Headlights
Auxiliary Audio Input
Brake Assist
Bucket Seats
Carbon Fiber Interior Trim
CD Player
Child Safety Locks
Cruise Control
Daytime Running Lights
Driver Adjustable Lumbar
Driver Air Bag
Driver Illuminated Vanity Mirror
Driver Vanity Mirror
Engine Immobilizer
Front Head Air Bag
Front Side Air Bag
HD Radio
Headlights-Auto-Leveling
Heated Mirrors
Intermittent Wipers
Keyless Entry
Knee Air Bag
Leather Steering Wheel
Mirror Memory
MP3 Player
Pass-Through Rear Seat
Passenger Adjustable Lumbar
Passenger Air Bag
Passenger Air Bag Sensor
Passenger Illuminated Visor Mirror
Passenger Vanity Mirror
Power Door Locks
Power Folding Mirrors
Power Mirror(s)
Power Steering
Power Windows
Privacy Glass
Rear Bench Seat
Rear Defrost
Rear Floor Mats
Rear Head Air Bag
Rear Spoiler
Run Flat Tires
Security System
Stability Control
Steering Wheel Audio Controls
Telematics
Traction Control
Transmission w/Dual Shift Mode
Trip Computer
Universal Garage Door Opener
Variable Speed Intermittent Wipers
Interior
Day-Night Auto-Dimming Rearview Mirror
Rear HVAC w/Separate Controls
Integrated Navigation System w/Voice Activation
Trip Computer
Proximity Key For Doors And Push Button Start
Power Door Locks w/Autolock Feature
Bmw Online Full Service Internet Access
Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button
Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer
Memory Settings -inc: Driver Seat And Door Mirrors
Perimeter Alarm
Manual Tilt/Telescoping Steering Column
Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru
Includes Power Side Bolster Support And Manual Thigh Support
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Cruise Control w/Steering Wheel Controls
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Dual Zone Front Automatic Air Conditioning
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Heated Front Sport Seats -inc: Lumbar Support
Power Rear Windows
Sport Leather Steering Wheel
Garage Door Transmitter
Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
Engine Immobilizer
Mechanical
Rear-Wheel Drive
Transmission: 6-Speed Manual
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control
Electro-Mechanical Limited Slip Differential
Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo
Electric Power-Assist Speed-Sensing Steering
Keys
Combo - 1
Executive Package - ZEC
Rear View Camera
Head-UP Display
Park Distance Control
Retractable Headlight Washers
Heated Steering Wheel
Exterior
Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M
Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
Fixed Rear Window w/Defroster
Tailgate/Rear Door Lock Included w/Power Door Locks
Lip Spoiler
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator
Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance
Entertainment
Bluetooth Wireless Phone Connectivity
Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory
Satellite Radio w/1 Year Subscription
16 Harman/Kardon Speakers
Radio: AM/FM Audio System
Safety/Security
Electronic Stability Control (Esc)
Dual Stage Driver And Passenger Front Airbags
Rear Child Safety Locks
Tire Specific Low Tire Pressure Warning
Curtain 1st And 2nd Row Airbags
Bmw Assist eCall Emergency S.O.S
Airbag Occupancy Sensor
Driver And Passenger Knee Airbag
ABS And Driveline Traction Control
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Other
CO2 Relevant Vehicles
C02 Content
Heated Steering Wheel
M Double-Clutch Transmission
18" Wheel 513 M Mixed Tires
Tire Pressure Monitor
Adaptive M Suspension
Alarm System
Universal Garage-Door Opener
Comfort Access Keyless Entry
Rear View Camera
Moonroof
Floor Mats
Auto-Dimming Mirrors
Auto-Dimming REARVIEW Mirror
Power Front Seats
Lumbar Support
Adjustable Seat Width/Lumbar
Storage Package
Heated Front Seats
Heated Rear Seats
Adjustable Front Armrest
Carbon Fiber Trim With Blk CHR
Retractable Headlight Washers
Park Distance Control
Rain Sensor And Auto Headlight
Xenon Headlights
Adaptive Light Control
Automatic Climate Control
Dynamic Cruise Control
Ambient Lighting
Additional 12-V Power Sockets
Emergency Trunk Release
Navigation System
Head-UP Display
Radio Control US
Satellite Radio w/1 Year SUB.
HARMAN KARDON Surround Sound
DVD Area Coding, North America
Bmw Assist ECALL
Bmw TELESERVICES
Bmw Online And Bmw APPS
Advanced RTTI
Remote Services
Hands-Free BLUETOOTH And USB
SHADOWLINE Exterior Trim
Anthracite HEADLINER
Hot Climate Version
Acoustic Belt Warning
Language Version English
Oil CHG 10,000 MLS/12 Months
Variable Light Decoding
Daytime Driving Lights
Shipping Package
Characteristic Control
Model Year Code
Transport Protection
NO Sunshades
Tier 2