2015 BMW M3 — VIN WBS3C9C53FP803376

История аукциона VIN WBS3C9C53FP803376

Пример отчета

Характеристики

VIN WBS3C9C53FP803376
Технические характеристики
Двигатель
Тип топлива
Цилиндры 6
Коробка передач A/T
Привод Rear Wheel Drive
Цвет кузова ALPINE WHITE
Кузов
Комплектация 4dr Sdn
Condition Notes
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Brake Assist Bucket Seats CD Player Child Safety Locks Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Engine Immobilizer Floor Mats Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Intermittent Wipers Keyless Entry Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Head Air Bag Rear Spoiler Security System Stability Control Steering Wheel Audio Controls Telematics Traction Control Transmission w/Dual Shift Mode Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Garage Door Transmitter Perimeter Alarm Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button Power Door Locks w/Autolock Feature Sport Leather Steering Wheel Includes Power Side Bolster Support Integrated Navigation System w/Voice Activation Heated Front Sport Seats -inc: Lumbar Support Bmw Online Full Service Internet Access Trip Computer Power 1st Row Windows w/Front And Rear 1-Touch Up/Down Day-Night Auto-Dimming Rearview Mirror Cloth/Leather Front Seats Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Dual Zone Front Automatic Air Conditioning Cruise Control w/Steering Wheel Controls 40-20-40 Folding Bench Front Facing Fold Forward Seatback Cloth/Leather Rear Seat Manual Tilt/Telescoping Steering Column Power Rear Windows Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Memory Settings For 2 -inc: Driver Seats And Door Mirrors Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Remote Releases -Inc: Power Trunk/Hatch Engine Immobilizer Rear HVAC w/Separate Controls
Mechanical
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Panic Brake Assist And Hill Hold Control Electro-Mechanical Limited Slip Differential Transmission: 6-Speed Manual Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo Rear-Wheel Drive Electric Power-Assist Speed-Sensing Steering
Keys
Combo - 1
Exterior
Lip Spoiler Fixed Rear Window w/Defroster Tailgate/Rear Door Lock Included w/Power Door Locks Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Tires: 255/40ZR18 95Y Front & 275/40ZR18 99Y Rear -inc: Mixed Performance Wheels: 18" x 9J Front & 18" x 10J Rear -inc: Light Alloy V-spoke, Style 513M Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator
Entertainment
Radio w/Clock, Speed Compensated Volume Control, Steering Wheel Controls, Voice Activation And DVD-Audio Radio: AM/FM Audio System Harman/Kardon Speakers Bluetooth Wireless Phone Connectivity
Safety/Security
Curtain 1st And 2nd Row Airbags Rear Child Safety Locks Dual Stage Driver And Passenger Front Airbags Dual Stage Driver And Passenger Seat-Mounted Side Airbags Bmw Assist eCall Emergency S.O.S Tire Specific Low Tire Pressure Warning Electronic Stability Control (Esc) Airbag Occupancy Sensor ABS And Driveline Traction Control
Other
CO2 Relevant Vehicles M Double-Clutch Transmission Tire Pressure Monitor Adaptive M Suspension Alarm System Universal Garage-Door Opener Gray Band Windshield Floor Mats Warning Triangle Auto-Dimming Mirrors Power Front Seats Storage Package Heated Front Seats Adjustable Front Armrest Highlight Trim Black Chrome Carbon Fiber Interior Trim Adaptive Light Control Additional 12-V Power Sockets Navigation System HARMAN KARDON Surround Sound Satellite Radio Preparation DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Hands-Free BLUETOOTH And USB SHADOWLINE Exterior Trim Oil CHG 10,000 MLS/12 Months Variable Light Decoding Daytime Driving Lights Shipping Package Transport Protection